Projects and Reports

Depending on the type and power for new and existing installations; regulations such as CTE, REBT, RITE, RD1890 / 2008 requires a report for the technical, energy, or renewable projects.

In line with renewable energy and facility projects, we offer services for street lighting in which the REBT requires an installation of more than 5 kW for a new project and more than 50% of installed power for those in remodel.

Ask us for renewable energy projects and other services like:

  • Installations (electrical, weather, etc.)
  • Street lighting
  • Building remodeling
  • Etc.
proyectos-de-energias-renovables